Jakarta-Bandung High-Speed Railway will use the latest generation CR400AF. Having a length of 142.3 km stretching from Jakarta to Bandung, the Jakarta-Bandung Fast Train has 4 halting stations, Halim, Karawang, Walini, Tegalluar with one depot located in Tegalluar. Each station will be integrated with mass transportation modes in each region.
The construction was carried out on a massive scale to pursue operational targets in 2021. Of the total length of the fast train track, more than 80 km of them have elevated structures while the remainder are 13 tunnels and sub-grades. Some temporary facilities such as the Batching Plant and Casting Yard are built at several critical points to support the acceleration of the development process.